jocenuestro
jocenuestro jocenuestro
  • 29-01-2022
  • Mathematics
contestada

An assembly line produces 500 jars of peanut butter in 4 hours. How many peanut butter jars are produced in 1 hr?

Respuesta :

Shadowfreddy311 Shadowfreddy311
  • 29-01-2022

Answer:

125

Step-by-step explanation:

500/4=125

Answer Link

Otras preguntas

Why are experimental investigations the best type of scientific investigation to demonstrate cause-and-effect relationships?
you have a rock of unknown origin and composition. A) What three test would you perform to determine what type of minerals are part of the rock? B) What chara
I need help on this one
Simplify using perfect squares or factor trees. Show your work. 1. √ 80
The formula for converting degrees Fahrenheit (F) to degrees Celsius (C) is C = 5/9(F - 32). Find C for F = 5 degrees. A: –15 degrees B: –27 degrees C: 3 de
Please answer 6 and 7
a certain mixture must contain 3 ounces of salt, 3 ounces of flour, and 4 ounces of grain for every 10 ounces in it. The mixture's ingredients are increased so
Ep-43 what does the letter "b" on a b-1 fire extinguisher indicate??
Why was the significance of the bay of pigs invasion in Cuba
Write the expression √a3 - b3 without radicals, using only positive exponents