supocsit2075
supocsit2075 supocsit2075
  • 28-07-2021
  • Computers and Technology
contestada

why SSTF disk scheduling is not practically feasible?​

Respuesta :

SneakySnek131
SneakySnek131 SneakySnek131
  • 28-07-2021

Answer:

There is a lack of predictability because of the high variance of response time. Additionally, SSTF may cause starvation of some requests. Starvation is possible for some requests as it favors easy to reach requests and ignores the far-away processes.

Answer Link

Otras preguntas

Area of a circle- pls pls pls help me- I'll give Brainly answer and big points.
A copy machine cost when new and has accumulated depreciation of . Suppose discards this machine and receives nothing. What is the result of the disposal​ tra
6-4x=7x-9x+8 What is the answer to my question
What is the sand and water mixed together in a beaker called
These images from the silk scroll painting "Along the River during the Qingming Festival" from the early 12th century CE are best understood in the context of
what number set 1/2 belongs to? rational, irrational, integer, or natural​
Find the mean of the data summarized in the given frequency distribution. Compare the computed mean to the actual mean of 56.6 degrees. Low Temperature ​(◦​F) 4
Which development resulted from a change in Umar’s policy toward Jerusalem by the Seljuks? (A) The beginning of the Crusades by European Christians (B) A shift
cheryl has a cup of hot chocolate with steam what all is matter
The letter b represents a nonzero constant. Solve 2bx-bx= -8 for x?