Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is not a reason that the process being monitored with the chart should be investigated?A. A single plot falls above or below the control limits
B. Normal behavior
C. A large number of plots are on or near the central line
D. No real trend in any direction
E. A change in raw materials or operators