josephk9262 josephk9262
  • 30-07-2019
  • Computers and Technology
contestada

Why is Scan scheduling also called Elevator algorithm?

Respuesta :

ExieFansler ExieFansler
  • 07-08-2019

Answer:

Scan scheduling is a disk scheduling algorithm.In this algorithm disk arm proceeds into a specific direction and responds to the requests coming on its way and after reaching at the end of the disk, it reverses direction and again responds to the request coming on its way. It works like an elevator and that is why it is also known as elevator algorithm.

Answer Link

Otras preguntas

Someone please help me!
X-9/3= -8 Solve for x
Who were New Mexico's first Senators? I
Which is an example of textual evidence that was used to support the claim in the sample analysis essay? A. On March 16, 1944, Anne wrote, "But, still, the brig
Using homologous structures and any other information (from notes, activities, etc), explain your opinion on the THEORY OF EVOLUTION in 8 sentences. Be sure to
Use the figure to find the measures of the numbered angles. Need help ASAP please I’ll give you 15 points
How many moles of hypomangonous acid, H3MnO4, are contained in 12.453 g ?
One grocery clerk can stock a shelf in 25 min. A second clerk requires 45 min to stock the same shelf. How long would it take to stock the shelf if the two cler
15) Amelia and Amy are alike in that they both 0) A) enjoy watching movies. B) have three older sisters. C) can act childish sometimes. D) destroy their sisters
(15×4)÷6[{32÷4(7×2-15+5)}+3]​plz show it with explain