portedon2085 portedon2085
  • 26-12-2023
  • Biology
contestada

Humans are often the least reliable component of a complex system.
In a complex engineering system, what is a common challenge associated with human reliability?

A) Consistency in output
B) Robotic automation
C) Variability in performance
D) Predictable behavior

Respuesta :

Otras preguntas

an animal that hides under a rock to avoid predators is responding to a what stimulus?
Factor completely 2b2-11b-40
What leader oversaw the greatest territorial expansion of the Mongol Empire?
The musical instrument store estimates costs of $18,750.00 annually to carry inventory of musical instruments and accessories. the costs include 12% for storage
Which are the major components of ribosomes?
The laptop liana wants to get is $8472 liana earns $0.16 a minute she wants to reach her goal in 1065 days how long a dot does she have to work?
why are the Watsons called the weird Watsons
Brandon sights a helicopter above a building that is 200 feet away at an angle of elevation of 30 degrees. To the nearest foot, How high above the ground the is
One year, a student council sold 856 copies of a school yearbook. Four fifths of the students at school bought a copy. How many students did not buy a yearbook?
Can you Answer the question